Dholera Allotment Rankings
Edition2026-Q3 Last verified04 AUG 2026

The unnamed proponents

A record with no allottee, kept in the register so that four names are never mistaken for the whole list.

No paid placement · No developer money · Nothing for sale

The answer, first

The DICDL Board’s Report signed 10 November 2025 closes its allottee list with the words other prominent industrial proponents and names none of them. This record exists so that the list of four named companies is never read as complete. It has no allottee name, no area, no date and no terms, because the source supplies none of them.

Where this parcel stands in the register

Rank by stated area
Unranked, the source prints no area
Rank by allotment date
Unranked, the source states no date
Area in hectares
UNKNOWN
Tenure as recorded
UNKNOWN
Record status
OFFICIAL
Fields populated
10 of 21

Which of the 21 fields this record fills

A filled square is a field the source document supplies. A hollow square is a field it leaves empty and this register refuses to fill.

The record as held

The record for Unnamed other proponents, field by field, exactly as held in the dataset
FieldValue as recorded
record_typeallotment_parcel
allottee_nameOther prominent industrial proponents (not named in source)
parcel_areaUNKNOWN
area_unitUNKNOWN
parcel_area_verbatimUNKNOWN
location_or_survey_referenceDholera Special Investment Region, industrial land (no plot or survey reference stated)
allotment_dateUNKNOWN
tenureUNKNOWN
lease_periodUNKNOWN
consideration_if_statedUNKNOWN
value_date2025-11-10
tagOFFICIAL
source_filedicdl_ar25.pdf
source_page20
allotment_date_basisUNKNOWN
stated_project_investmentUNKNOWN
consideration_noteUNKNOWN
intended_useUNKNOWN
18 fields shown of 21. Source: dicdl_ar25.pdf, Annual Report 2024-25, printed page 9, 'Status of Company's Affairs'. Last verified: 4 August 2026. Download parcels.csv.

Reading note

A register with an empty row is more honest than a register with a tidy one. The Board’s Report ends its allottee list with a phrase rather than a name, and this record is that phrase, kept in the dataset so that four disclosed names are never counted as the total number of allottees in Dholera SIR. It has no allottee, no area, no date and no terms, and it ranks on nothing. Its only function is to stop the register from overstating its own completeness.

This page of the source carries 4 other parcel records as well: Tata Semiconductor, Renew Photovoltaics, Polycab India, Inox Air Products.

What is not recorded here

11 of the 21 fields are empty on this record, and they are named rather than hidden, because on a parcel register the empty fields are the finding: parcel_area, area_unit, parcel_area_verbatim, allotment_date, tenure, lease_period, consideration_if_stated, allotment_date_basis, stated_project_investment, consideration_note, intended_use. What each field would have held is set out in the field dictionary on the dataset page.

What would change this record

Names. If a future annual report or a board resolution lists the proponents this one leaves unnamed, this placeholder record splits into as many records as there are names, and the register grows without a single existing figure changing.