Dholera Allotment Rankings
Edition2026-Q3 Last verified04 AUG 2026

Inox Air Products

The last name on the list before the source stops naming, and a record with no area, date or term of its own.

No paid placement · No developer money · Nothing for sale

The answer, first

M/s Inox Air Products Limited is the fourth and last named allottee in the DICDL Board’s Report signed 10 November 2025. After it the source stops naming and writes only other prominent industrial proponents. Its holding carries no area, no plot reference, no allotment date, no lease term and no consideration anywhere in this source set.

Where this parcel stands in the register

Rank by stated area
Unranked, the source prints no area
Rank by allotment date
Unranked, the source states no date
Area in hectares
UNKNOWN
Tenure as recorded
UNKNOWN
Record status
OFFICIAL
Fields populated
10 of 21

Which of the 21 fields this record fills

A filled square is a field the source document supplies. A hollow square is a field it leaves empty and this register refuses to fill.

The record as held

The record for Inox Air Products, field by field, exactly as held in the dataset
FieldValue as recorded
record_typeallotment_parcel
allottee_nameM/s Inox Air Products Limited
parcel_areaUNKNOWN
area_unitUNKNOWN
parcel_area_verbatimUNKNOWN
location_or_survey_referenceDholera Special Investment Region, industrial land (no plot or survey reference stated)
allotment_dateUNKNOWN
tenureUNKNOWN
lease_periodUNKNOWN
consideration_if_statedUNKNOWN
value_date2025-11-10
tagOFFICIAL
source_filedicdl_ar25.pdf
source_page20
allotment_date_basisUNKNOWN
stated_project_investmentUNKNOWN
consideration_noteUNKNOWN
intended_useUNKNOWN
18 fields shown of 21. Source: dicdl_ar25.pdf, Annual Report 2024-25, printed page 9, 'Status of Company's Affairs'. Last verified: 4 August 2026. Download parcels.csv.

Reading note

Position in the printed list matters here. This is the fourth name, and immediately after it the source stops naming companies and writes only other prominent industrial proponents. So this record marks the exact boundary of what DICDL was prepared to disclose in that report: four names, no figures, and then a phrase. Everything past this record in the allottee list is held in this register as a single unnamed placeholder.

This page of the source carries 4 other parcel records as well: Tata Semiconductor, Renew Photovoltaics, Polycab India, Unnamed other proponents.

What is not recorded here

11 of the 21 fields are empty on this record, and they are named rather than hidden, because on a parcel register the empty fields are the finding: parcel_area, area_unit, parcel_area_verbatim, allotment_date, tenure, lease_period, consideration_if_stated, allotment_date_basis, stated_project_investment, consideration_note, intended_use. What each field would have held is set out in the field dictionary on the dataset page.

What would change this record

A per company area or a dated allotment letter. This record sits at the end of the named list, so a future annual report that expands the list is also likely to be the document that finally gives it a figure.