Renew Photovoltaics
Named in the audited annual report as an allottee, and given nothing else. This page shows exactly how little the public record holds.
No paid placement · No developer money · Nothing for sale
The answer, first
M/s Renew Photovoltaics Private Limited is the second allottee named in the DICDL Board’s Report signed 10 November 2025. Its holding is inside the 530 acre aggregate and nowhere else. No area, no plot reference, no allotment date, no lease term and no consideration is stated for it in any document in this source set.
Where this parcel stands in the register
- Rank by stated area
- Unranked, the source prints no area
- Rank by allotment date
- Unranked, the source states no date
- Area in hectares
- UNKNOWN
- Tenure as recorded
- UNKNOWN
- Record status
- OFFICIAL
- Fields populated
- 10 of 21
Which of the 21 fields this record fills
A filled square is a field the source document supplies. A hollow square is a field it leaves empty and this register refuses to fill.
The record as held
| Field | Value as recorded |
|---|---|
| record_type | allotment_parcel |
| allottee_name | M/s Renew Photovoltaics Private Limited |
| parcel_area | UNKNOWN |
| area_unit | UNKNOWN |
| parcel_area_verbatim | UNKNOWN |
| location_or_survey_reference | Dholera Special Investment Region, industrial land (no plot or survey reference stated) |
| allotment_date | UNKNOWN |
| tenure | UNKNOWN |
| lease_period | UNKNOWN |
| consideration_if_stated | UNKNOWN |
| value_date | 2025-11-10 |
| tag | OFFICIAL |
| source_file | dicdl_ar25.pdf |
| source_page | 20 |
| allotment_date_basis | UNKNOWN |
| stated_project_investment | UNKNOWN |
| consideration_note | UNKNOWN |
| intended_use | UNKNOWN |
| 18 fields shown of 21. Source: dicdl_ar25.pdf, Annual Report 2024-25, printed page 9, 'Status of Company's Affairs'. Last verified: 4 August 2026. Download parcels.csv. | |
Reading note
The whole public record for this allottee, in this source set, is one sentence on one page. The name does not appear in the gazette notification, in the 99 page allotment policy, in the November 2025 cleanroom procurement, or on the rate card page. There is no plot, no survey number, no town planning scheme reference and no village against it. A reader who wants an area for Renew Photovoltaics will find only the 530 acre figure that covers the whole named group, and dividing that by four would be arithmetic performed on a guess.
This page of the source carries 4 other parcel records as well: Tata Semiconductor, Polycab India, Inox Air Products, Unnamed other proponents.
What is not recorded here
11 of the 21 fields are empty on this record, and they are named rather than hidden, because on a parcel register the empty fields are the finding: parcel_area, area_unit, parcel_area_verbatim, allotment_date, tenure, lease_period, consideration_if_stated, allotment_date_basis, stated_project_investment, consideration_note, intended_use. What each field would have held is set out in the field dictionary on the dataset page.
What would change this record
A per company area in a board resolution, a committee minute or a registered deed would move this record from unranked to ranked in one step. The next annual report is the most likely place for it, since the current one names the company and prints only the group total.